Once
upon a time, year 1978 a big decision was made by the engineers constructing a
big steel plant in southwest of germany. What machine shall control all the
stuff ? A new system was coming up named SOLAR by the company SEMS. Bus
structured, realtimeable, multiuser, multiprocessing, small and fast operating
system, hardware-adapters for all possible electrical signals, what do they need
else ?
So, in 1980 two years later the biggest SEMS system ever build was growing up in
the computer rooms of the new steel plant. With help from ARBED in Luxembourg
installation and programming was made in shortest time. In just one year, the
hole system was running. Because of the big success, future extensions were made
with the same technology. Here is the complete list of system components, only
in the main plant, three years later:
75 |
Power
supply a 200 Watt = 15KW |
PWS20
|
346 |
Serial
interfaces simple current |
ADS02
|
4 |
Serial
interfaces V24 |
ADV02
|
4176 |
digital
static inputs |
DIL48
|
2176 |
digital
interupt inputs |
DIC32
|
2304 |
digital
outputs |
DOL32
|
124 |
Decimal
counters |
DCT04
|
4 |
Analogue
outputs 0-10V/DC |
AOL04
|
12 |
Analogue
outputs 4-20mA |
AOL04
|
32 |
Analog
fast measurement channels |
AMH16
|
676 |
Measurements
inputs 0-10V/DC |
IMH16
|
14 |
MSU
with 50MB removable disks |
DPB50
|
5 |
MSU
with 10MB removable disks |
DRI44B
|
7 |
MTU
tape units with 25IpS and 45IpS |
MTB16
|
14 |
Central
processing units (CPU65+CPU40) |
ECB65
|
17 |
I/O
processor |
IOPSMA0
|
8 |
MW
of memory (16Bit) that is 16MB RAM |
SC256
|
1987 all systems work without any serious problems. Two SEMS technicians take
care day and night since installation.
To replace the SEMS systems with DEC Mikrovaxes and SPS5 of SIEMENS was a first
step done by the steel plant owners to participate of the advantages of the
market during the last 20 years. At last they got a lot of unexpected
difficulties because of the decentralized structure with independant companys,
software updates, software releases, license fees, responsibility problems when
errors come up, and so on.
But
then, the technicians around Mr. Walter, former of SEMS in germany, had a great
idea. Together with a software company RST near munich, they offered a solution
for all needs.
The
VMEbus
Using VMEbus solves every problem. Because of the bus structure, slightly to
SOLAR, all components can be placed from the front. The engineering group
of IAW developed an interface card which is plugged into the back of the
VME rack, so it is possible to use the DIL/DOL connectors again. That means no
changes in the existing process cabling of the 800 I/O signals was necessary.
Can You imagine the great advantage. With this interface we are able to emulate
nearly every existing old connector system from old machines whatever
manufacturer it is.
Two years later the first three SEMS systems were replaced by VMEbus wih our
interface cards. Together with RST, the visualisation and databases were
realized on the VMEbus system also. With our new partners Systemforschung und
Woehrle we offer the best from all to satisfy Your needs. The databases and
visualisation is now running on PCs, controling, steering, and I/Os are running
on fast VMEBus systems.